11 DE ABRIL 2015 (SÁBADO)

1. 400 NV
    8X50 (2C/E) PN
    4X100 (1C/E) (75N + 25F)

2. 4X50 PRO 1-4
    2X25 SPRINT
    1X50 REC
    4X50 UF UF
    2X25 SPRINT
    1X50 REC
    4X50 REG 4-1
    2X25 SPRINT
    1X50 REC
    4X50 (25 SPRINT + 25 REC)
    2X25 SPRINT
    1X50 REC
    4X50 (25 REC + 25 SPRINT)
    2X25 SPRINT
    1X50 REC
    4X50C R/100
    1X100 REC

3. 600 PN MIX
  

10 DE ABRIL 2015 (VIERNES)

1. 200C (WHITE) (20")
    175E (PINK) (20")
    150B (RED) (20")
    125M (BLUE) (20")
    100C (WHTE) (20")
    75E (PINK) (20")
    50B (RED) (20")
    25M (BLUE)

2. 6X75B (RED) (P) (10")
    12X50B (RED) (10")

3. 300C (GRUA) (A)

4. 18X100C UA

    - 5 C/1'40" - 1'50"
    - 4 C/1'35" - 1'45"

5. 300PN MIX REC

9 DE ABRIL 2015 (JUEVES)

1. 600C (R-L) PINK (30")
    12X25 (4C/-C) UF UF C/45"
    400X AC VIR (20")
    12X25C UF UF C/45"

2. 4X25 (1C/E) SALIDA + SPRINT
    50 REC
    4X25 (1C/E) VIR + SPRINT
    50 REC
    4X25 (1C/E) SPRINT + LLEG
    50 REC

4. 15' TEC VIR

5. 800X PN (175 N + 25 SPRINT)

6. 32X25M C/40" - 45" - 50"

7. REC

8 DE ABRIL 2015 (MIÉRCOLES)

1. 4X150 (X-C) PRO 1-4 (20")

2. 4X200C UA (20")
    4X25C PN SPRINT C/1'
    4X150C UA (15")
    4X25C PN SPRINT C/1'
    4X100C UA (10")
    4X25C PN SPRINT C/1' 
    4X50C UA (5")
    4X25C PN SPRINT C/1' 

3. 300E TEC (P)
    12X25E PRO 1-4 (10")
    6X50E 25 N + 25 SUB (A)

4. 400B SD

7 DE ABRIL 2015 (MARTES)

1. 400C PINK (20")
    6X25C SPRINT C/45"
    300C RED (20")
    8X25C SPRINT C/45"
    200C BLUE (20")
    10X25C SPRINT C/45"

2. 400B PN (20")
    10X50B TEC (A)
    24X25B R/100 C/40" - 50"

3. 3X
          100M GUS (20")
          2X50M SUP (10")
          4X25M SPRINT C/M

4. 400E REC

6 DE ABRIL 2015 (LUNES)

1. 100X (10")
    200X (15")
    300X (20")
    400X

2. 4X400C UA (25")

3. 8X25C PN SPRINT RES (A) C/1'
    100 REC
    6X25C PN SPRINT (A) C/1'
    100 REC
    4X25C PN SPRINT C/1'
    100 REC

4. 6X50E RED (P&G) (P) (10")
    5X50E RED (P) (10")
    4X50E R/200 (10")

5. 100 REC